NRT Notification Detail
| Risk of interruption for Metop-A, Metop-B and Metop-C data on 04. february 2020 for the period 09:00-17:00. (Ann 5573 Rev:3)
|
DATE: 2020-02-06 13:47
TYPE: NRT-GTS
|
| Description
|
Dear ROM SAF GTS User



Issued : 2020-02-06 13:42 UTC

Risk-of-interruption on Metop-A, Metop-B and Metop-C data.

Please see the message from Eumetsat below.





Kind regards

The ROM SAF Team





Type: 	Planned Maintenance

Ann Nr: 	5573

Rev: 	3

Start Time: 	2020-02-04 09:00:00.0

End Time: 	2020-02-04 17:00:00.0

Satellites: 	Metop-A,Metop-B,Metop-C

Subsystem: 	GRAS

Subject: 	ground-segment-maintenance

Impact: 	risk-of-interruption

Detail: 	Software Release of GRAS PPF. Changes to the GRAS Level 1 product algorithms. The algorithm changes include technical improvements and bug fixes, as well as support to the changed data formats of the auxiliary files provided by the Radio Occultation Support Network (RSN). The first deployment will be on 4 February 2020, still using the current RSN auxiliary files. The second deployment will be on 12 February 2020, using the changed RSN auxiliary files. There is a risk of an interruption of GRAS production and a temporary deterioration of product timeliness, between 09:00 and 17:00 UTC. [Rev 2] The software release is postponed to a future date. [Rev. 3] The release planned on 04 February 2020 took place as planned. However the second part initially planned for 12 February 2020 is postponed to a future date. Please refer to Announcement 5574.

Status: 	scheduled

Issue Time: 	2020-02-05 16:35:54.0

Services: 	GRAS Level 1 - Metop-A

GRAS Level 1 - Metop-B

GRAS Level 1 - Metop-C




|
Back to NRT Notifications List
Newer Older
|
|
|
|
|
|