|
NRT Notification Detail
Scheduled degradation/outage of Metop-B/GRAS level 1b data
|
DATE: 2013-04-19 16:11
TYPE: NRT-GTS
|
Description
|
Dear ROM SAF GTS User



Issued: 2013-04-19 16:10 UTC



Due to a Metop-B in-plane manoeuvre on April 23 there is a high

risk of outages/degradations of upstream Metop-B/GRAS level 1b data.

The manoeuvre is planned for 12:51 UTC on April 23.



As a consequence there is a risk of outages/degradations of ROM SAF

Metop-B/GRAS level 2 products on April 23.



With kind regards

The ROM SAF Team


|
Back to NRT Notifications ListNewer Older
|
|
|
|