|
NRT Notification Detail
Upgrade of ROM SAF Metop-A and B NRT production related to ECMWF Cy38r2 upgrade
|
DATE: 2013-06-19 11:18
TYPE: DATA
|
Description
|
Dear ROM SAF Data User



Issued: 2013-06-19 13:18 UTC



On Thursday, June 20, 2013, the ROM SAF upgrades the NRT production.

This upgrade is relevant for the NRT refractivity products (GRM-01 and

GRM-40) and is described in detail in this notification from June 18:

http://www.romsaf.org/view_notification.php?id=429



In addition, this upgrade also prepares the NRT production for both

Metop-A and B for the shift from 91 to 137 model levels of the ECMWF

forecast (Cy38r2) scheduled to take place on June 25, 2013. The ROM SAF

NRT background profiles will follow the ECMWF level structure and shift to

137 levels simultaneously, and the production and quality control will

henceforth be based on the new ECMWF model output.



With kind regards

ROM SAF team


|
Back to NRT Notifications ListNewer Older
|
|
|
|