|
|
|
|
NRT Notification Detail
| Metop-A instrument-maintenance 2017-12-19 ( Ann Nr: 3399 )
|
DATE: 2017-12-07 16:47
TYPE: NRT-GTS
|
| Description
|
Dear ROM SAF GTS User



Issued : 2017-12-07 16:41 UTC



Type: 	Planned Maintenance

Ann Nr: 	3399

Rev: 	1

Start Time: 	2017-12-19 00:00:00.0

End Time: 	2018-03-01 00:00:00.0

Satellites: 	Metop-A

Subsystem: 	GRAS

Subject: 	instrument-maintenance

Detail: 	During the indicated period, the GRAS receiver onboard Metop-A will undergo a series of tracking parameter tests aiming at improving the signal characteristics of rising occultations. In particular, the campaign aims at reducing vertical error correlations of bending angles in the lower stratosphere, at the same time minimizing side effects. During this period, the number of daily occultations from Metop-A as well as the penetration of rising occultations into the mid and lower troposphere might vary more than usual.

Status: 	scheduled

Issue Time: 	2017-12-07 16:11:46.0

Services: 	GRAS Level 1 - Metop-A

GRAS AHRPT Metop-A







Kind regards

The ROM SAF Team




|
Back to NRT Notifications List
Newer Older
|
|
|
|
|
|