|
|
|
|
NRT Notification Detail
| Risk of interruption for Metop-B data for the period 9. January 05:30 to 28. January 2019 05:30. (Ann nr: 5493 Rev nr: 1)
|
DATE: 2019-12-19 16:52
TYPE: NRT-GTS
|
| Description
|
Dear ROM SAF GTS User



Issued : 2019-12-19 16:40 UTC

There is a risk of integretion for Metop-B data on 09.01.2020 - 05:30 to 28.01.2020 - 05:30



Please see the massage from eumetsat below.



Kind regards

The ROM SAF Team



Type: 	Planned Maintenance

Ann Nr: 	5493

Rev: 	1

Start Time: 	2020-01-09 05:30:00.0

End Time: 	2020-01-28 05:30:00.0

Satellites: 	Metop-B

Subject: 	ground-segment-maintenance

Impact: 	data-delayed

Detail: 	Possible McMurdo Critical Maintenance in order to replace some equipment at the ground station. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during this period. Please note that the station might be unavailable only from Monday to Saturday between 05:30 and 07:30 UTC during the maintenance period.

Status: 	scheduled

Issue Time: 	2019-12-18 17:18:37.0

Services: 	SEM L0 - Metop-B

AMSU-A Level 1 - Metop-B

AVHRR Level 1 - Metop-B

HIRS Level 1 - Metop-B

ASCAT Level 1 - Metop-B

MHS Level 1 - Metop-B

IASI Level 1 - Metop-B

GRAS Level 1 - Metop-B

GOME-2 Level 1 - Metop-B

ATOVS Sounding products - Metop-B

AVHRR Polar Winds - Metop-B

IASI Sounding Products - Metop-B

ASCAT Soil Moisture - Metop-B

Multi-Sensor Products - Metop-B

Multi-Metop Wind ProductsName: 	EUMETSAT

Address: 	Eumetsat-Allee 1

D-64295 Darmstadt

Germany

Telephone: 	+49 6151 807 3660/3770

Fax: 	+49 6151 807 3790

E-mail: 	ops@eumetsat.int

Internet: 	www.eumetsat.int




|
Back to NRT Notifications List
Newer Older
|
|
|
|
|
|