NRT Notification Detail
| Risk of minor interruptions of Metop-A data during the period 9 June 2020 to 16 August 2020
|
DATE: 2020-06-09 13:48
TYPE: NRT-GTS
|
| Description
|
Dear ROM SAF GTS User



Issued : 2020-06-09 13:40 UTC



We have currently experienced an outage of GRAS level 1 data from Metop-A in the time period from 10:36 UTC to 13:36 UTC. This has resulted in an outage of ROM SAF level 2 Metop-A data.

The outage is due to a planned maintenance of the GRAS receiver onboard Metop-A.

There is a risk of further minor interruptions in the period from today to 16 August 2020, please see the message from EUMETSAT below.



Kind regards

The ROM SAF Team





Type: Planned Maintenance

Ann Nr: 5894

Rev: 1

Start Time: 2020-06-09 00:00:00.0

End Time: 2020-08-16 00:00:00.0

Satellites: Metop-A

Subsystem: GRAS

Subject: general-announcement

Impact: risk-of-interruption

Detail: During the indicated period, the GRAS receiver onboard Metop-A will undergo a series of tracking parameter tests aiming at extending the measurements in the ionosphere. During this period, the number of daily occultations from Metop-A as well as the penetration of rising occultations into the mid and lower troposphere might vary more than usual. Periodic outages of 1 orbit will be possible due to patch uplink to the instrument.

Status: scheduled

Issue Time: 2020-05-14 08:20:32.0

Services: GRAS Level 1 - Metop-A






|
Back to NRT Notifications List
Newer Older
|
|
|
|
|
|