|
|
|
|
NRT Notification Detail
| Metop-B data delayed 9 Nov. (Ann. nr: 6393; Rev:2)
|
DATE: 2020-11-03 15:19
TYPE: NRT-GTS
|
| Description
|
Dear ROM SAF GTS User



Issued : 2020-11-03 15:16 UTC



McMurdo Black Island Critical Maintenance. The maintenance will be split in two periods: 09 Nov 2020 from 04:30 to 06:30 UTC and from 22:00 to 23:00 UTC. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system might be interrupted. Therefore only nominal Arctic timeliness might be available during these periods. [Rev. 2] Date and Details updated.



Pls see the message from Eumetsat below.



Kind regards

The ROM SAF Team

Type: 	Planned Maintenance

Ann Nr: 	6393

Rev: 	2

Start Time: 	2020-11-09 04:30:00.0

End Time: 	2020-11-09 23:00:00.0

Satellites: 	Metop-B

Subject: 	ground-segment-maintenance

Impact: 	data-delayed

Detail: 	McMurdo Black Island Critical Maintenance. The maintenance will be split in two periods: 09 Nov 2020 from 04:30 to 06:30 UTC and from 22:00 to 23:00 UTC. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system might be interrupted. Therefore only nominal Arctic timeliness might be available during these periods. [Rev. 2] Date and Details updated.

Status: 	scheduled

Issue Time: 	2020-11-03 14:36:02.0

Services: 	SEM L0 - Metop-B

AVHRR Level 1 - Metop-B

HIRS Level 1 - Metop-B

MHS Level 1 - Metop-B

AMSU-A Level 1 - Metop-B

ASCAT Level 1 - Metop-B

IASI Level 1 - Metop-B

GRAS Level 1 - Metop-B

GOME-2 Level 1 - Metop-B

ATOVS Sounding products - Metop-B

IASI Sounding Products - Metop-B

ASCAT Soil Moisture - Metop-B

AVHRR Polar Winds - Metop-B

Multi-Sensor Products - Metop-B

Multi-Metop Wind Products




|
Back to NRT Notifications List
Newer Older
|
|
|
|
|
|