|
|
|
|
NRT Notification Detail
| Data from Metop-B data delayed 30. November 2020 (Ann:6478 Rev:1)
|
DATE: 2020-11-26 16:23
TYPE: NRT-GTS
|
| Description
|
Dear ROM SAF GTS User



Issued : 2020-11-26 16:17 UTC

Data delayed from 2020-11-30 02:00 to 	2020-12-01 06:00.

McMurdo Black Island Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during this period. The maintenance period is on 30 November and 01 December 2020, both days between 02:00 and 06:00 UTC.

Pls see the message from Eumetsat below.



Kind regards

The ROM SAF Team



Type: 	Planned Maintenance

Ann Nr: 	6478

Rev: 	1

Start Time: 	2020-11-30 02:00:00.0

End Time: 	2020-12-01 06:00:00.0

Satellites: 	Metop-B

Subject: 	ground-segment-maintenance

Impact: 	data-delayed

Detail: 	McMurdo Black Island Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during this period. The maintenance period is on 30 November and 01 December 2020, both days between 02:00 and 06:00 UTC.

Status: 	scheduled

Issue Time: 	2020-11-26 15:51:49.0

Services: 	SEM L0 - Metop-B

AVHRR Level 1 - Metop-B

AMSU-A Level 1 - Metop-B

MHS Level 1 - Metop-B

HIRS Level 1 - Metop-B

ASCAT Level 1 - Metop-B

GRAS Level 1 - Metop-B

IASI Level 1 - Metop-B

GOME-2 Level 1 - Metop-B

ATOVS Sounding products - Metop-B

IASI Sounding Products - Metop-B

ASCAT Soil Moisture - Metop-B

AVHRR Polar Winds - Metop-B

Multi-Sensor Products - Metop-B

Multi-Metop Wind Products


|
Back to NRT Notifications List
Newer Older
|
|
|
|
|
|