NRT Notification Detail

Scheduled outage/degradation of GRAS Level 1 b data
DATE:   2012-03-02 08:52
TYPE:   NRT-GTS
Description
Dear ROM SAF GTS User Issued 2012-03-02 08:50 UTC Due to a Metop-A manoeuvre today at 13:00 UTC there will be an outage/degradation of GRAS level1b data and subsequently an outage/degradation of ROM SAF NRT products. ROM SAF products will be flagged accordingly. The outage/degradation is expected to last 4 to 5 hours. Please see detailed message from EUMETSAT below. Kind regards The ROM SAF Team Forwarded Message: Subject: Metop maneouvre today, 13:00 UTC From: Christian Marquardt Date: 2012-03-02 07:37 UTC Dear all, due to a collision avoidance manoeuvre today, 02 March 2012 at 13:00 UTC, the operational Precise Orbit Determination system of the GRAS processing at EUMETSAT will undergo a reset. Subsequently, bending angle data quality will be degraded for 4-5 hours after the event. The data will be flagged accordingly. With kind regards, Christian. -- Dr. Christian Marquardt, Polar System Product Expert EUMETSAT, Eumetsatallee 1, D-64295 Darmstadt, Germany
Back to NRT Notifications List

Newer     Older

DMI's logo IEEC's logo Met Office's logo ECMWF's logo WEGC's logo