|
|
NRT Notification Detail
Scheduled Degradation of Metop-B GRAS level 1b data
|
DATE: 2013-08-06 08:14
TYPE: NRT-GTS
|
Description
|
Dear ROM SAF GTS User



Issued 2013-08-06 08:15 UTC



Due to a scheduled Metop-B in-plane manoeuvre tomorrow, 2013-08-07, upstream GRAS level 1 b data will be degraded for a period of approx 4 hours after the manoeuvre. The ROM SAF refractivity product based on Metop-B data (GRM-40) will be flagged accordingly.



Please see detailed message from EUMETSAT below.



With kind regards

The ROM SAF Team



Forwarded Message:

Subject: Metop-B Manoeuvre on 7 August 2013

From:Christian Marquardt

Date: 2013-08-05 20:53 UTC



Dear all,



I'm writing to let you know that Metop-B will undergo a scheduled in-plane manoeuvre on Wednesday, 7th August 2013, around 13:11 UTC. As usual, GRAS level 1b bending angle data (as well as downstream level 2 data produced by the ROM SAF) will be degraded for approximately 4 hours after the event due to the necessary reset of the precise orbit determination shortly after the manoeuvre. The data will be flagged accordingly.



GRAS data from Metop-A will not be affected.



With kind regards,



 Christian.



--

Dr. Christian Marquardt, Remote Sensing Expert

EUMETSAT, Eumetsatallee 1, D-64295 Darmstadt, Germany

Tel: +49-6151-807456, Fax: +49-6151-807304

Web: http://www.eumetsat.int


|
Back to NRT Notifications List
Newer Older
|
|
|
|