|
|
NRT Notification Detail
Planned Maintenance
|
DATE: 2016-08-25 13:04
TYPE: NRT-GTS
|
Description
|
Type: 	Planned Maintenance

Ann Nr: 	2119

Rev: 	1

Start Time: 	2016-08-31 11:38:00.0

End Time: 	2016-08-31 11:52:00.0

Satellites: 	Metop-A

Subject: 	out-of-plane-manoeuvre

Detail: 	Out-of-plane manoeuvre. All instrument data will be unavailable or degraded during this period. The exact burn time will be announced closer to the day of the manoeuvre. Burn time = 11:38:26 UTC. Burn duration = 832 seconds.

Status: 	scheduled

Issue Time: 	2016-08-11 08:58:30.0

Services: 	AMSU-A Level 1 - Metop-A

AVHRR Level 1 - Metop-A

HIRS Level 1 - Metop-A

SEM L0 - Metop-A

ASCAT Level 1 - Metop-A

GRAS Level 1 - Metop-A

MHS Level 1 - Metop-A

IASI Level 1 - Metop-A

GOME-2 Level 1 - Metop-A

ATOVS Sounding products - Metop-A

ASCAT Soil Moisture - Metop-A

IASI Sounding Products - Metop-A

AVHRR Polar Winds - Metop-A

Multi-Sensor Products - Metop-A

ASCAT AHRPT Metop-A

AMSU-A AHRPT Metop-A

AVHRR AHRPT Metop-A

GOME-2 AHRPT Metop-A

GRAS AHRPT Metop-A

HIRS AHRPT Metop-A

MHS AHRPT Metop-A

IASI AHRPT Metop-A

SEM AHRPT Metop-A

EARS-ATOVS

EARS-AVHRR

EARS-ASCAT

EARS-IASI

O3M SAF - Products

OSI SAF - Products

H-SAF - Products

ROM SAF - Products




|
Back to NRT Notifications List
Newer Older
|
|
|
|