|
|
|
|
NRT Notification Detail
| data from Metop-A og Metop-B delayed on 20 october 2016 ongoing (ann 2308)
|
DATE: 2016-10-21 13:54
TYPE: NRT-GTS
|
| Description
|
Dear ROM SAF GTS User



Issued : 2016-10-21 13:50 UTC



GRAS level 1 data is delayed from both Matop-A og Metop-B ongoing

se message below



Kind regards

The ROM SAF Team



Type: 	Service Alert

Ann Nr: 	2308

Rev: 	1

Start Time: 	2016-10-20 08:21:00.0

Satellites: 	Metop-A, Metop-B

Subsystem: 	GRAS

Subject: 	ground-segment-anomaly

Impact: 	data-degraded

Detail: 	GRAS level 1 BUFR data on GTS has been corrupted since the upgrade of the GRAS Radio Occultation Level 1b processing to Wave Optics (Ann. Nr. 2240). As a consequence, GRAS Level 1 processing has been temporarily rolled back to the previous version (4.3, geometrical optics) on 21/10/2016 at 09:37 UTC sensing time for Metop-A and at 12:14 UTC for Metop-B.

Status: 	ongoing

Issue Time: 	2016-10-21 12:13:37.0

Services: 	GRAS Level 1 - Metop-A

GRAS Level 1 - Metop-B


|
Back to NRT Notifications List
Newer Older
|
|
|
|
|
|